🚗 EV Charging Time · NEC Article 625 · IEC 61851 Wallbox Sizing

22 kWh EV Battery Charging Time on 4.6 kW (230V 20A Single-Phase)

Real-world charging duration (10–80%, 20–80%, and 0–100%), range added per hour, charging cost, and electrical circuit breaker sizing.

10% to 80% Charge Time3h 43m20%–80%: 3h 11m
Full 0% to 100% Time5h 26mGrid Energy: 24.4 kWh
Driving Range Added / Hour+23.6 km/h+14.7 miles / hour
Circuit Breaker Required25A (NEC)19.2A @ 240V (1P)

Charging Time & Electrical Specification Table (22 kWh @ 4.6 kW)

EV Battery Usable Capacity22 kWh
Charger Output Rating4.6 kW (230V 20A Single-Phase)
10% to 80% Charging Time (Daily / Highway Optimal)3h 43m (3.72 hours)
20% to 80% Charging Time3h 11m (3.19 hours)
0% to 100% Full Charge Time (with BMS Tapering)5h 26m (5.43 hours)
Estimated Full Charge Cost (US / Germany / Sweden)$4.27 (US) · €8.3 (DE) · 40.26 kr (SE)
Continuous Current Draw & Breaker19.2 A @ 240V (1-Phase) → 25A NEC / 20A IEC Breaker

Frequently Asked Questions

How long does it take to charge a 22 kWh EV battery at 4.6 kW?

Charging a 22 kWh electric vehicle battery from 10% to 80% on a 4.6 kW (230V 20A Single-Phase) takes approximately 3h 43m (or 5h 26m for a full 0% to 100% charge including charger efficiency and BMS tapering).

What breaker size is required for a 4.6 kW EV charger?

At 240V (1-Phase), a 4.6 kW charger draws 19.2A continuously, requiring a 25A breaker under US NEC 625.41 (125% continuous load rule) or a 20A breaker under European IEC/NEK standards.