10% to 80% Charge Time4h 22m20%–80%: 3h 45m
Full 0% to 100% Time6h 24mGrid Energy: 60.0 kWh
Driving Range Added / Hour+49.3 km/h+30.6 miles / hour
Circuit Breaker Required50A (NEC)40.0A @ 240V (1P)

Charging Time & Electrical Specification Table (54 kWh @ 9.6 kW)

EV Battery Usable Capacity54 kWh
Charger Output Rating9.6 kW (240V 40A Level 2 NEMA 14-50)
10% to 80% Charging Time (Daily / Highway Optimal)4h 22m (4.37 hours)
20% to 80% Charging Time3h 45m (3.75 hours)
0% to 100% Full Charge Time (with BMS Tapering)6h 24m (6.39 hours)
Estimated Full Charge Cost (US / Germany / Sweden)$10.5 (US) · €20.4 (DE) · 99.0 kr (SE)
Continuous Current Draw & Breaker40.0 A @ 240V (1-Phase) → 50A NEC / 40A IEC Breaker

Frequently Asked Questions

How long does it take to charge a 54 kWh EV battery at 9.6 kW?

Charging a 54 kWh electric vehicle battery from 10% to 80% on a 9.6 kW (240V 40A Level 2 NEMA 14-50) takes approximately 4h 22m (or 6h 24m for a full 0% to 100% charge including charger efficiency and BMS tapering).

What breaker size is required for a 9.6 kW EV charger?

At 240V (1-Phase), a 9.6 kW charger draws 40.0A continuously, requiring a 50A breaker under US NEC 625.41 (125% continuous load rule) or a 40A breaker under European IEC/NEK standards.