⚡ Cu ρ (75°C): 0.0214 Ω·mm²/m 🔌 NEC / IEC Standards: NFPA 70 & IEC 60364 🇺🇸 US Grid Avg: $0.175/kWh 🇩🇪 DE Grid Avg: €0.345/kWh 🇸🇪 SE Elpris: 1.54 SEK/kWh 🇳🇴 NO Strøm: 1.17 NOK/kWh 🔩 Copper Ref: $9,650/t (2026-10-25)
🚗 EV Charging Time · NEC Article 625 · IEC 61851 Wallbox Sizing

98 kWh EV Battery Charging Time on 120 kW (Supercharger V2 / DC Rapid)

Real-world charging duration (10–80%, 20–80%, and 0–100%), range added per hour, charging cost, and electrical circuit breaker sizing.

10% to 80% Charge Time41 min20%–80%: 35 min
Full 0% to 100% Time1h 10mGrid Energy: 106.5 kWh
Driving Range Added / Hour+630.4 km/h+391.7 miles / hour
Circuit Breaker Required225A (NEC)173.2A @ 400V (3P)

Charging Time & Electrical Specification Table (98 kWh @ 120 kW)

EV Battery Usable Capacity98 kWh
Charger Output Rating120 kW (Supercharger V2 / DC Rapid)
10% to 80% Charging Time (Daily / Highway Optimal)41 min (0.68 hours)
20% to 80% Charging Time35 min (0.58 hours)
0% to 100% Full Charge Time (with BMS Tapering)1h 10m (1.17 hours)
Estimated Full Charge Cost (US / Germany / Sweden)$18.64 (US) · €36.21 (DE) · 175.72 kr (SE)
Continuous Current Draw & Breaker173.2 A @ 400V (3-Phase) → 225A NEC / 175A IEC Breaker

Frequently Asked Questions

How long does it take to charge a 98 kWh EV battery at 120 kW?

Charging a 98 kWh electric vehicle battery from 10% to 80% on a 120 kW (Supercharger V2 / DC Rapid) takes approximately 41 min (or 1h 10m for a full 0% to 100% charge including charger efficiency and BMS tapering).

What breaker size is required for a 120 kW EV charger?

At 400V (3-Phase), a 120 kW charger draws 173.2A continuously, requiring a 225A breaker under US NEC 625.41 (125% continuous load rule) or a 175A breaker under European IEC/NEK standards.